Stremler

View Original

Specialty Chemicals

Mission

Our customer is one of the largest producer of specialty chemicals in Germany and supplier for all global key industries. The manufacturing of his main product is a complicated network of chemical processes which are linked to each other in loops. The production quality and duration varies so that a continuous matching between the facilities´ flows are necessary. The objective of this project is to implement a real time planning platform to synchronize the network of chemical production processes by simulation and optimization. 

Solution and Work Process

In the current status we are realizing a proof-of-concept to demonstrate the feasability and the benefits of integrated and dynamic planning.

  • Specification of an integrated and dynamic planning and control of the network production with material loops

  • Concept to integrate the detailed planning and scheduling into the operational planning architecture of the customer

  • Demonstration of the advantages by simulating the cause-effect relationsships and the impacts on the order fulfilment

Results

The STREMLER REALTIME TECHNOLOGIES application integrates the different local planning tools in one, extendable system with following benefits:

  • Substitution of local and static planning tools in Excel by our dynamic and integrated planning system

  • Transparency about the current status and the impacts of planning

  • Higher reactivity in case of changes by What-if-scenarios and Digital Twin


JOIN OUR HONOURABLE LIST OF SUCCESS STORIES!

See this content in the original post